ESM REK Bitola
Client: | ESM REK Bitola, Mine SUVODOL |
Project: | Automation of "0BTO" conveyor system |
Description: | "Turn-key". Project design, installation, commissioning and putting into operation. Supply and assembly of the low voltage cabinets for the "0BTO" system. Automation realized for four conveyer systems with five S7-300 PLCs, Profibus – SICLIMAT modem network and WinCC SCADA system. Connection to bagger SRS 1300. |
Realized: | December 2003 |
Client: | ESM REK Bitola |
Project: | Coal mills slip prevention |
Description: | "Turn-key". Complete automation project Slip prevention of eighteen coal mills in the Power Plant. Realized with SIMATIC S7-200 PLCs. Parameterization and operator interface with graphical operator panel OP37 and three OP7, and visualization software ProTOOL. |
Realized: | June 2001 |
Client: | ESM REK Bitola |
Project: | Reconstruction of excavator SRS 1300 |
Description: | Technical support to REK Bitola and Siemens Greece for choosing the equipment for the reconstruction of Bagger SRS 1300. Supply of the complete electrical equipment from Rittal, Phoenix Contact, Klauke, Lapp Kabel and Eplan to Siemens Greece, which was a general supplier also of Siemens equipment. The bagger was reconstructed with S5 and S7 PLCs, with distributed peripheries. Parameterization and operator interface realized with text and color graphic panels. Motor drives with SIKOSTART Soft Starters, SIMOREG DC inverters, SIMOVERT AC vector inverters. |
Realized: | September 2000 |